Case Study Tag: Historian

A food manufacturer decided to automate a manual process as a continuous improvement initiative to save on physical labor and material handling costs while improving their supply chain.
Multi-plant control system upgrade for a specialty chemical plant, enhancing production capacity
A specialty chemicals manufacturer of fuel additives needed to increase production capacity and improve the overall reliability of their system.

A&E Engineering and
Apex Manufacturing Are Now SkyIO.

The sky is no longer the limit. It's where we're headed.